Battery Energy Storage Systems

Tired of High Maximum Demand Charges? BESS Is Your Fix

Battery storage that quietly charges up when power is cheap and kicks in right at your peak - so your Maximum Demand charges drop without changing a single thing about how your business runs.

  • Suruhanjaya Tenaga Class A electrical contractor licence

    EC Class A

  • CIDB Malaysia Grade G7 certification

    CIDB G7

  • Certification Partner Global ISO 9001:2015 certified company

    ISO 9001:2015 certified

  • SEDA registered PV monitoring system

    SEDA registered installer

11:00am · Sunny

Solar runs your building for free, fills the battery, and sells the spare to TNB.

3:00pm · Peak hour

Your factory spikes. The battery covers it, so TNB records a lower Maximum Demand.

11:00pm · Off-peak

Power is cheapest. TNB refills the battery, ready for tomorrow's peak.

Free powerFills the batterySpare sold to TNBBattery covers your peakTNB tops upRefills overnightSOLARYOUR BUILDINGTNB GRIDMAQO BATTERY
Solar powerBattery powerTNB grid power

The Problem

Maximum Demand charges are climbing fast

TNB's 2025 tariff restructuring sharply increased Maximum Demand (MD) charges - billed on your single highest 30-minute usage spike, not your total consumption.

Before

RM 100k

Doubled

After restructuring

RM 200k

RM 100k more

Typical monthly MD charge for the same facility

2pm – 10pm

Weekday peak window where a single spike sets your MD charge

30 minutes

MD is billed on your highest 30-min block, not your total usage

Tens of thousands

What one uncontrolled spike can add to a single month's bill

Maximum Demand, Explained

Your TNB bill is set by your busiest 30 minutes

Cut that one peak with a battery, and the demand charge for the whole month drops.

1

What is Maximum Demand (MD)?

TNB averages your power use every 30 minutes. The highest one in the month is your MD. You pay RM97.06 for every kW of it.

2

How a battery cuts your MD

When your factory goes above the blue line, the battery supplies the extra. TNB never sees the peak, so it only bills you up to the line.

780 kW
From TNBFrom batteryMD that TNB bills

RM23,294

saved every month

MD 1,020 → 780 kW

Bill RM99,001 → RM75,707

Per year RM279,533

Example factory on TNB Medium Voltage ToU (RM30.19 capacity + RM66.87 network = RM97.06 per kW of MD). The battery charges off-peak, so your energy use (kWh) stays the same; the saving is on the kW demand charge. Actual savings depend on your load profile.

What Is BESS?

A large-scale battery, working like an industrial power bank

A Battery Energy Storage System stores electricity when it's cheap or plentiful, then releases it exactly when your site needs it most - a process called peak shaving. Modern lithium-ion systems run at 80–90% round-trip efficiency.

MAQO battery energy storage system container
Off-Peak · Charging

Store energy while it's cheap

The battery charges from solar generation or low-tariff grid power, building up reserve for the hours ahead.

Peak · Discharging

Deploy it during your spike

When your load climbs toward a new Maximum Demand peak, the battery discharges automatically to flatten it.

How BESS Works

From solar and grid, to a cheaper bill

1

Solar / Grid

Energy flows in from your rooftop solar and the grid during off-peak hours.

2

Battery Storage

Your BESS stores that energy on-site, ready to use whenever you need it.

3

Smart Energy Management

Software decides when to charge, hold, or discharge - no manual switching.

4

Business Load

Stored power covers your peak, lowering your Maximum Demand.

Key Benefits

Six reasons businesses are adding BESS

Maximum Demand / Peak Shaving

Flatten your highest 30-minute spike, the single number your MD charge is based on.

Lower Energy Costs

Shift consumption away from your most expensive tariff periods automatically.

Energy Management

One system that reads your load profile and makes the charge/discharge call in real time.

Solar Energy Optimisation

Capture excess solar generation instead of exporting or curtailing it, and use every kWh on-site.

Backup / Energy Resilience

Keep critical loads running through short grid interruptions.

Fully Integrated System

Solar, battery and grid work as one - solar powers your site and charges the BESS, the BESS discharges to cut your peak, and the grid stays purely as backup and export credit.

The MAQO BESS Solution

A turn-key solution, start to finish

The same team that assesses your site designs, builds, and keeps your BESS running for as long as you own it.

01

Energy Analysis & Site Assessment

We study your load profile and TNB bill to size a system that pays for itself.

02

MAQO Invests & Builds

Our in-house, SEDA-qualified team designs, supplies and installs the system.

03

Operate & Maintain

We monitor and maintain the system for its full operating life.

04

You Save From Day One

Lower MD charges show up on your very next TNB bill.

Business Model

Two ways to fund your BESS

Own it outright

Direct Purchase

Buy your system with cash, a bank loan, or a credit facility, and keep 100% of your MD savings and long-term returns.

  • Full ownership from day one
  • Maximum long-term savings
  • Still fully MAQO-installed & maintained

0% upfront cost

Zero CAPEX

Adopt BESS for your business with 0% upfront cost. MAQO invests in and builds the battery system at your site, so high energy savings start without touching your capital.

  • MAQO invests in & builds the battery system at your site
  • No upfront cost to get started
  • Guaranteed savings and stronger operational resilience
  • Worry-free maintenance, handled by MAQO

Talk to MAQO About BESS

Free site assessment - we'll show you exactly how much a battery system could cut from your Maximum Demand charges.